Monday 20th January 2020

[DC5-A] Scheduled maintenance Room 120 - Racks G1, F11, scheduled 3 weeks ago

A scheduled maintenance is planned in DC5-A (Room 120 - Racks G1, F11) in order to optimize and upgrade our infrastructure.

It will be done gradually on the racks, in the same order as in the object of the maintenance.

As a result servers will lose their public network connectivity as our switches are being upgraded, but private network connectivity will still be functional. It will come back gradually following the scheduled upgrades.

Updates will be posted below as the maintenance is going on.

Start : February 4th, 2020 - 0600Z (0700LT)

Duration : 2 hours

===================

04.02.20 0715Z (0815LT)

All servers are up and running. Do not hesitate to contact our support team should you have any issue

04.02.20 0635Z (0735LT)

Part of F11 is back online and operations continue for the rest of it

04.02.20 0613Z (0713LT)

Operations are starting for F11

04.02.20 0610Z (0710LT)

G1 is up and running. Preparations for F11 begin

04.02.20 0600Z (0700LT)

Operations are starting for G1