Tuesday 21st April 2020

[DC3] Scheduled maintenance in Room 4-5 / Racks : A5→A20, scheduled 1 month ago

A scheduled maintenance is planned in part of the room 4-5, DC3, in order to optimize and upgrade our infrastructure. The impacted racks are : A5→A20

As a result, servers will lose their public network connectivity during less than 15s as our router will be moved to another equipment, but private network connectivity will still be functional.

If your server is in the racks listed above, you will receive a ticket on your account.

Start : April 29th, 2020 - 0600UTC (0800LT)

Maintenance window : 180 minutes

===================

04.29.2020 0610Z (0810LT)

Isolation done, physical shift in progress

Traffic disruption planned at

0630UTC (0830LT) for ipv6

0640UTC (0840LT) for ipv4

04.29.2020 0645Z (0845LT)

Traffic shifted, we’ll move remaining link

04.29.2020 0702Z (0902LT)

Migration done. The intervention was successful.