Tuesday 21st April 2020

[DC3] Scheduled maintenance in Room 4-3 / Racks : A1→A12;B1→B12;A14→23;B13→B23, scheduled 1 month ago

A scheduled maintenance is planned in part of the room 4-3, DC3, in order to optimize and upgrade our infrastructure. The impacted racks are : A14→23;B13→B23

As a result, servers will lose their public network connectivity during less than 15s as our router will be moved to another equipment, but private network connectivity will still be functional.

If your server is in the racks listed above, you will receive a ticket on your account.

Start : April 29th, 2020 - 0600UTC (0800LT)

Maintenance window : 180 minutes

===================

04.29.2020 0710Z (0910LT) Migration starts

04.29.2020 0714Z (0914LT) Isolation done, physical shift in progress

04.29.2020 0720Z (0920LT) Physical shift done

Traffic disruption planned at

0730UTC (0930LT) for ipv6

0740UTC (0940LT) for ipv4

04.29.2020 0750Z (0950LT) We are a little late on migration

You could see some saturation on the outgoing traffic

everything should be back in less than 30minutes. We apologize for the inconvenience.

04.29.2020 0810Z (1010LT) Migration done.