[DC3] Curative maintenance on UPS - Interface card replacement, scheduled 3 months ago

[DC3] Curative maintenance on UPS - Interface card replacement

Location : DC3

What is done : We will carry out acurative maintenance on the UPS C3 of electrical chain C.
The inverter of theseelectrical chain supply racks of IT halls. This maintenance requires the isolation and shutdown of the UPS.
The operation will not have any impact on the IT load of the Datacenter : the others UPS of the electrical chain are sized to recover the load from the offline UPS.

Operations will be performed by our maintainer under our permanent supervision.

Impact : None

Start : 23-Apr-2020 0700Z (0900LT)

Duration : 180 minutes