Friday 29th May 2020

[MAINTENANCE DC5-A] Racks E1;E2;E3;E4;E5;E6, scheduled 1 month ago

A scheduled maintenance is planned in DC5-A with a physical displacement of your servers listed above in order to optimize and upgrade our infrastructure. Servers will be unavailable for the duration of the maintenance detailed below.

This status will be updated as the operations are going through to keep you informed about the events.

Start : June 8th, 2020 - 2000UTC (2200LT)

End : June 9th, 2020 - 0300UTC (0500LT)

(0120LT) RPN switch for E05 rack has been replaced due to power supply issue, everything is good after replacement