Wednesday 8th July 2020

[DC3] Scheduled maintenance on RPN SAN HA

Location : DC2 DC3 What will be done : Network equipment maintenance on :

  • San HA HDD 17-31
  • San HA SSD 4 What will be done : We are modifying the firmware of a switch at DC2. This will require a reboot of the equipment. Therefore the SANs master will be switched from DC3 instead of DC2 during the maintenance.

Impact : No service interruption. The keepalive will ensure the service remain available and does not timeout. You may notice a short lag but your SAN won't timeout. There redundancy will be lost during this maintenance.

Start : 08-july-2020 1700Z (1900LT) Duration : 30 minutes