Scheduled Maintenance
[DC5] Scheduled maintenance Room 1 - Racks A67, A68, B1, B3, B4

A scheduled maintenance is planned in DC5 (Room 1 - A67, A68, B1, B3, B4) in order to optimize and upgrade our infrastructure.

It will be done gradually on the racks, in the same order as in the object of the maintenance.

As a result servers will lose their public network connectivity as our switches are being upgraded, but private network connectivity will still be functional. It will come back gradually following the scheduled upgrades. We estimate the downtime to be between 20 and 30 minutes.

Updates will be posted below as the maintenance is going on.

Start : December 02nd, 2020 - 06:00 UTC

Duration : 2 hours

[DC3] Pressurization maintenance

We will realized a pressurization maintenance on substation SSA, SSB and SSC.

  • Sub station A, 16/12
  • Sub station B, 17/12
  • Sub station C, 18/12

This maintenance will be carried by our maintainer under our permanent supervision.

Start: 2020-12-16 0830Z (0930LT)
End: 2020-12-18 1600Z (1700LT)
[DC3] Scheduled Maintenance - DC5 Redundancy

Location : DC5 datacenter

What is done : As part of the Datacenter's preventive maintenance operations, we are going to carry out a redundancy test of the infrastructures.

Impact : Degradation of electrical redundancy for DC5/PAR-2

Start : 02-Dec-2020 1300Z 1400LT
End : 04-Dec-2020 1300Z 1400LT

Duration : 3 days

[DC5] Scheduled Maintenance - DC5 Power Generators Preventive Mechanical Maintenance

Location : DC5 datacenter

What is done : As part of an annual checks, we will verify the electrical installations on all the electrical component in the DC5 data center. This intervention take 8 days and will be supervised by our control office.

Impact : LOW Electrical Redundancy Loss

Start : 02Dec-2020
End : 04-Dec-2020

Duration : 3 days

Every evening, the generators on which maintenance are been performed will be put back into service. No group will remain out of service in the absence of the maintainer.

[DC5] Scheduled Maintenance - Software upgrade

A scheduled maintenance is planned in DC5 in order to upgrade our optical transmission infrastructure.

The nature of this work is to perform a software upgrade just on one of our DWDM equipment units.

Impact: no production downtime during the maintenance window.

Updates will be posted below as the maintenance is going on.

Start : December 03st, 2020 - 08:00 UTC

Duration : 2 hours

[DC3] Preventive maintenance of CRAC units

We will carry out the semi-annual preventive maintenance of CRAC units according to the schedule below.
CRAC units will be shut down one at a time, so as not to impact the cooling of halls.

Each IT zone has CRAC unit called «backup»: each CRAC unit is doubled.
Each MVLB hall has a main air hanling unit (AHU).

The maintenance will be done according to the following schedule:
• MLV​Bs: 09/12/2020 to 11/12/2020
• Operators halls: 04/12/2020
• IT halls n°4: 07/12/2020 and 10/12/2020
• IT halls n°3: 07/12/2020 and 09/12/2020
• IT halls n°2: 08/12/2020
• IT halls n°1: 08/12/2020

The maximum cut-off time per CRAC unit is otherwise defined at 1 hour.

Impact: Loss of cooling redundancy during the preventive maintenance operation of a CRAC unit (max 1h). No impact on the cooling of facilities.

Supervision of return and blowing temperatures during operation. Interventions mastered by the maintainer with the possibility of returning very quickly in initial configuration in the event of anomaly.

In the event of fault not immediately correctible and impacting the operation of the “backup” CRAC unit associated with the CRAC unit in maintenance, the maintainer will restart the CRAC unit in maintenance very quickly. If necessary, CRAC units adjacent to the faulty zone may be switched to degraded (forced) operation.

Start: 2020-12-04 0730Z (0830LT)
End: 2020-12-11 1730Z (1830LT)

Duration: 6 business days

[DC5] Scheduled maintenance Room 1 - Racks B5, B9, B10, B11

A scheduled maintenance is planned in DC5 (Room 1 - B5, B9, B10, B11) in order to optimize and upgrade our infrastructure.

It will be done gradually on the racks, in the same order as in the object of the maintenance.

As a result servers will lose their public network connectivity as our switches are being upgraded, but private network connectivity will still be functional. It will come back gradually following the scheduled upgrades. We estimate the downtime to be between 20 and 30 minutes.

Updates will be posted below as the maintenance is going on.

Start : December 09th, 2020 - 06:00 UTC

Duration : 2 hours

Past Incidents

Tuesday 1st December 2020

[EOL] End of life of C2 and ARM instances

Dear Customers,

As a reminder, C2 and ARM64 instances will be terminated as of December 1, 2020.

All instances will be permanently terminated.

We can’t stress enough that you need to migrate to Scaleway Elements’ Development Instances, General Purpose Instances or Bare Metal Cloud Servers before this date. We also added a new instance from €0.0025/hour - Stardust, that may help you for small tasks :

https://www.scaleway.com/en/elements/

https://www.scaleway.com/en/stardust-instances

If you have any questions regarding your migration:

Follow this step by step tutorial on how to migrate your data from C2 and ARM64 to Virtual Instances : https://www.scaleway.com/en/docs/migrate-c2-arm64-to-virtual-instance-using-rsync

You can also reach us on our Scaleway Community Slack where you can ask questions to peers and Scaleway staff : https://slack.scaleway.com/

If you need further help, please call our advisers and/or Account Managers.

Thank you for your trust,

The Scaleway team

Monday 30th November 2020

No incidents reported

Sunday 29th November 2020

No incidents reported

Saturday 28th November 2020

No incidents reported

Friday 27th November 2020

Hosting [Webmail] Mail delivery issue Scaleway <--> Orange

We are currently encountering a delivery issue with our mailing service.
Email sent from "Orange" (French ISP provider) toward Scaleway and vice versa, may not be received.
Our teams are working on a fix.

Next update as soon as we have more information.

===================

11/27/20 0930Z (1030LT)

The product team has identified the root cause and working on a fix

11/27/20 0900Z (1000LT)

Issue has been escalated to local team

Thursday 26th November 2020

RPN services [DC3] RPN switches down in Room 3-4, Racks A9 and D15

RPN switches are down in Room 3-4, Racks A9 and D15.
RPN connectivity is unavailable for servers in those racks.

===================

11.25.20 1500Z (1600LT)

Switch in rack A9 is back online.

11.25.20 1458Z (1558LT)

Switch in rack D15 is back online.

11.25.20 1445Z (1545LT)

Issue has been escalated to local team

Dedibox IPv6 provisioning issues

We have identified a bug on the IPv6 provisioning system.
As a result of this bug, prefixes created or updated since November 19th were not properly configured on the DHCPv6 server and could thus not be used.

===================

11.26.20 1105Z (1205LT)

The product team has fixed the issue, DHCPv6 provisioning is working again.

11.26.20 1055Z (1155LT)

Issue has been escalated to local team

Wednesday 25th November 2020

DC5 Network [DC5] Room 1 rack D26 unreachable

All servers located in DC5 room 1 rack D26 currently appear to be unreachable.

We will update this status as soon as we have more information.

===================

2020-11-26 0600Z (0700LT)

Issue has been fixed, portals are available again.

2020-11-25 2200Z (2300LT)

Issue has been escalated to local team

Elements API Scaleway Elements API issues

We have noticed issues with the Scaleway Elements API.
Services behind PAR1 and AMS1 APIs are unavailable.

===================

11.25.20 1045Z (1145LT)

Issue is fixed and the API is available again without errors.

11.25.20 1025Z (1125LT)

Issue has been escalated to local team

DC2/DC3/DC5 portals unavailable

DC2, DC3 and DC5 portals are currently unavailable.
It is not possible to open tickets on DC2, DC3 and DC5 as a result.

===================

11.25.20 1028Z (1128LT)

Issue has been fixed, portals are available again.

11.25.20 1007Z (1107LT)

Issue has been escalated to local team

RPN services [DC3] RPN switch down - Room 43 Rack F7

An RPN switch in DC3 Room 43 Rack F7 is encountering issues and is down.
RPN connectivity in this rack is currently unavailable.

===================

11.25.20 1015Z (1115LT)

The switch has been fixed and is up and running again. RPN connectivity is restored in that rack.

11.25.20 0925Z (1025LT)

Issue has been escalated to local team

Tuesday 24th November 2020

No incidents reported