Some systems are experiencing issues

About This Site

Maintenances and incidents regarding our services, networks and datacenters can be followed here.

Scheduled Maintenance
[MAINTENANCE DC5-A] Racks E1;E2;E3;E4;E5;E6

A scheduled maintenance is planned in DC5-A with a physical displacement of your servers listed above in order to optimize and upgrade our infrastructure. Servers will be unavailable for the duration of the maintenance detailed below.

This status will be updated as the operations are going through to keep you informed about the events.

Start : June 8th, 2020 - 2000UTC (2200LT)

End : June 9th, 2020 - 0300UTC (0500LT)

[MAINTENANCE DC5-A] Racks B1;B2;B5;B6;B14;C9;C10;C13;C14;C15;C16;C17;C18;C19

A scheduled maintenance is planned in DC5-A with a physical displacement of your servers listed above in order to optimize and upgrade our infrastructure. Servers will be unavailable for the duration of the maintenance detailed below.

This status will be updated as the operations are going through to keep you informed about the events.

Start : June 15th, 2020 - 2000UTC (2200LT)

End : June 16th, 2020 - 0300UTC (0500LT)

[DC3] Preventive electrical maintenance of generators

[DC3] Preventive electrical maintenance of generators

We’re going to carry out the preventive electrical maintenance of generators.

The maintenance will be performed electrical chain by electrical chain, so that super-rescue generators (chain F1) can recover the load, in the event of an electrical incident coming from the usual network of energy supply.
Maintenance will be carried out according to the following forecast schedule:

  • Chaine A : 22/06
  • Chaine B : 23/06
  • Chaine C : 24/06
  • Chaine D : 25/06
  • Chaine F1 : 29/06
  • Chaine F2 : 30/06

Every evening, generators on which maintenance has been done will be put back into service.
No generator will remain out of service in absence of the maintenance company

Impact : Degradation of electrical redundancy

Start : 22-Jun-2020 0630Z (0830LT)
End : 30-Jun-2020 1530Z (1730LT)
[DC3] Maintenance of fire suppression systems

Maintenance of fire suppression systems

Control VESDA system

Control manual triggers

Control sound and visual alarms

Control Actuated Devices of Safety

Control alarm reports

Control fire suppression valves (outside datarooms)

Control smoke extraction and extraction engine

Impact : none

Schedule : 22-23-Jun 2020 0730-1600Z 0930-1800LT
30-Jun-3-Jul 2020 0730-1600Z 0930-1800LT
13-17-Jul 2020 0730-1600Z 0930-1800LT
[DC3] Semi-annual maintenance of distribution pumps

[DC3] Semi-annual maintenance of distribution pumps

We will perform the semi-annual maintenance of the distribution pumps. Operations will be performed by our maintainer under our permanent supervision, according to the following previsional schedule:

 Wednesday June 24th Sub-stationA
 Thursday June 25th Sub-stationB
 Friday June 26th Sub-stationC

Substations A and B supply the chilled water network of the computer halls. Substation C supplies the chilled water network of the operators halls and the air handing units.

Impact : no impact for customers

Start : 24-Jun-2020 0700Z 0900LT

Duration : 13 Days

[DC3] Pressurization maintenance

[DC3] Pressurization maintenance

What is done : We will perform a pressurization maintenance on substation SSA, SSB and SSC.

Sub station C, June 26th

Sub station A &B, June 29th

Impact : None

Start : 26-Jun-2020 0730Z 0930LT

Duration : 2 Days

Past Incidents

Tuesday 12th November 2019

DC3 - Preventive maintenance of air-handling units, scheduled 6 months ago

DC3 - Preventive maintenance of air handling units

Location : DC3

What is done : preventive maintenance of air handling units will be performed on the whole site.

Thursday November 12th: Room 01 and 02

Wednesday November 13th: Room 03 and 04

Thursday November 14th: TGBT A and B

Friday November 15th: TGBT C and D

Monday November 18th: TGBT F1 and F2

Impact : loss of redundancy during the preventive maintenance of a TGBT air handling unit. No impact on TGBT cooling.

Start : 12-Nov-2019 0700Z 0900LT

Duration : 5 Days

Wednesday 6th November 2019

DC3 - Semi-annual maintenance of distribution pumps, scheduled 6 months ago

DC3 - Maintenance of distribution pumps

Location : DC3 Substation-A, Substation-B, Substation-C

What is done : We will perform the semi-annual maintenance of the distribution pumps. Operations will be performed by our maintainer under our permanent supervision, according to the following previsional schedule:

Wednesday November 6th: Sub-station A

Thursday November 7th Sub-station B

Friday November 8th Sub-station C

Substations A and B supply the chilled water network of the computer halls. Substation C supplies the chilled water network of the operators halls and the air handing units.

Impact : no impact for customers

Start : 6-Nov-2019 0700Z 0900LT

Duration : 3 Days

Thursday 10th October 2019

Refrigeration units preventive maintenance, scheduled 7 months ago

We will undertake a preventive maintenance on our refrigeration units on DC3.

Impact: Minor loss of redundancy, no customer impact.

START: 10-Oct-2019 0630Z 0830LT

END: 11-Nov-2019 0330Z 0530LT

Wednesday 9th October 2019

DC3 - Redundancy test of DC3 electrical generators, scheduled 7 months ago

DC3 electrical generators - Redundancy test of DC3 electrical generators

Location : DC3 What is done : As part of the preventive maintenance of the Datacenter, we will proceed to a redundancy test of the Datacenter infrastructure. The operation consists of simulating a power failure on the MVLBs and validating the electrical load recovery and working on generator for 4 hours. Impact : no impact on client servers

Start : 9-Oct-2019 0700-1400Z 900-1600LT

Duration : 4 hours

Thursday 12th September 2019

PAR1 Compute API [SCALEWAY] Instances actions unavailability

We have detected an issue with administrative actions on instances in the PAR region (creation, stopping, deletion, etc.).

===================

09.12.19 1205Z (1405LT)

Issue has been escalated to local team

09.12.19 1430Z (1630LT)

The product team has identified the root cause and working on a fix

09.12.19 1450Z (1650LT)

The product team is fixing the issue and actions are being processed again progressively

Mail [WEBHOSTING] Mail Connection Issue

Our teams identified an issue regarding webmail connection.

We are currently investigating the issue and will update this status as soon as we have more details to share.

===================

12/09/19 0900 (1100LT)

Issue has been escalated to local team

ODS ODS Instance unavailability

We have detected issues with several ODS Instances.

Our teams are currently working on solving the problem.

Impact: Some ODS Instances may be unavailable.

===================

09.12.19 - 0830Z (1030LT)

Issue has been escalated to local team

09.12.19 - 1400Z (1600LT)

Issue has been fixed completely

Console [FAILOVER] Attribution of Failover IP stuck in update state.

We encountered issue with attibution of Failover IP to servers using console. They stuck and remain in update state (orange)

Next update by 12.09.19 0800Z (1000LT)

===================

11.09.19 2230Z (12.09.2019 0030LT)*

Issue has been escalated to local team

===================

12.09.19 0830Z (12.09.2019 1030LT)*

The issue has been fixed.

Wednesday 11th September 2019

Public AMS Network Update, scheduled 8 months ago

In order to continuously improve performance, we will be updating part of our public network in Amsterdam.

Operation completed successfully.

Impact: Server reinstallation can be slowed down

START: 11-Sept-2019 0700Z 0900LT

END: 11-Sept-2019 0900Z 1100LT Operation completed successfully.

Tuesday 10th September 2019

Mail Mail Connection Issue

Our teams identified an issue regarding webmail connection.

We are currently investigating the issue and will update this status as soon as we have more details to share.

===================

10/09/19 1210 (1410LT)

Issue has been escalated to local team

10/09/19 1310 (1510LT)

The issue has been fixed. If you still experience webmail connection difficulties please contact support via ticket.

Monday 9th September 2019

No incidents reported

Sunday 8th September 2019

DC5 Network Performance issues on one of our links

Performance issues were detected on one of DC5's links starting at 4pm utc on the 8th of September. You may have experienced latency or packet loss.

The issue is being mitigated by our network team since 8:30am utc today, the situation is now being monitored.

Saturday 7th September 2019

ODS ODS Instance unavailability

We have detected issues with several ODS Instances.

Our teams are currently working on solving the problem.

Impact: Some ODS Instances may be unavailable.

===================

09.09.19 - 1010Z (1210LT)

The issue has been identified and fixed.

09.07.19 - 0840Z (1040LT)

Issue has been escalated to local team

Friday 6th September 2019

No incidents reported

Monday 2nd September 2019

AMS1/DC3 Public network, scheduled 9 months ago

Preventive maintenance over the network between AMS1 and DC3

Network supplier must perform maintenance on his Network.

Maintenance window is from September 7th, 2019 at 07:00 am UTC to September 7th, 2019 at 7:00 pm UTC.

The expected Impact length is 12 hours at the maximum, during the maintenance window

Impact : Possible downtime, flaps or degraded bandwidth on the network between AMS1 and DC3