[DC5] Mechanical maintenance + Tests in charge of generators.
Scheduled Maintenance Report for Scaleway
Completed
The scheduled maintenance has been completed.
Posted May 12, 2022 - 15:30 CEST
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted May 03, 2022 - 08:30 CEST
Scheduled
As part of the preventive maintenance operations of the Datacenter, we will carry out mechanical maintenance of the generators followed by an infrastructure redundancy test.

The operation consists of simulating a power cut to the TGBTs and validating load recovery as well as operation on generator sets after mechanical maintenance of each set according to the following provisional schedule:

• GE LT1.1: 03/05/22 (between 8:30 a.m. and 3:30 p.m.)
• GE LT1.2: 04/05/22 (between 8:30 a.m. and 3:30 p.m.)
• GE LT2.1: 05/05/22 (between 8:30 a.m. and 3:30 p.m.)
• GE LT2.2: 09/05/22 (between 8:30 a.m. and 3:30 p.m.)
• GE LT7.1: 10/05/22 (between 8:30 a.m. and 3:30 p.m.)
• GE LT7.2: 11/05/22 (between 8:30 a.m. and 3:30 p.m.)
• GE BAT 1: 12/05/22 (between 8 a.m. and 2 p.m.) No impact for IT.

Our teams as well as the usual maintenance companies will be mobilized for the smooth running of operations.
Posted Apr 12, 2022 - 11:55 CEST
This scheduled maintenance affected: Dedibox - Datacenters (DC5).