[DC3] Curative maintenance of the modbus card on GF2
Scheduled Maintenance Report for Scaleway
Completed
The scheduled maintenance has been completed.
Posted Apr 28, 2021 - 15:30 CEST
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Apr 28, 2021 - 09:00 CEST
Scheduled
We will do a diagnostic of the modbus card on chiller 2.
During this operation the chiller 2 will be stopped a few minutes.

Operations will be performed by the manufacturer.
Since only one refrigeration unit is switched off at the same time, only the redundancy is degraded.

In the event of a failure of a chiller operating in the same substation as the maintenance one, our maintainer will have the possibility to restart the chiller quickly or, in case of failure, to mix the chilled water networks SSA and SSB.
Posted Apr 22, 2021 - 17:58 CEST
This scheduled maintenance affected: Dedibox - Datacenters (DC3).