Scheduled
We are going to carry out an intervention on the SSA automaton in order to correct anomalies. During the maintenance, the sub-station A will be switched to manual mode to maintain continuity of service.

All the equipment of the SSA refrigeration production will be switched to manual operation during the intervention on the PLC program. The skills present for this maintenance: Automatician and Scaleway technical engineer.

In case of malfunction of the automaton, the installation will be controlled manually by the operators present on site.

Please note that no impact is expected for this maintenance.
Posted Apr 27, 2021 - 17:54 CEST
This scheduled maintenance affected: Dedibox - Datacenters (DC3).