Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Jan 15, 2024 - 08:01 CET
Scheduled
In order to provide the ability to attach IPv6 addresses to Load Balancers, a migration must be performed.
The expected downtime will be about 2 seconds, and existing TCP sessions will be reset.
The migrations will be done between the 15th of January and the 15th of February 2024 at 8 to 9am CET each day
All targeted LBs' owners will receive an email for every single impacted LB, containing the predefined migration timeslot.
If you need your Loadbalancer to be migrated on a specific day, feel free to contact us via the #load-balancer Slack Community channel or via the ticket which will be automatically opened in regards to this migration.
Posted Jan 05, 2024 - 10:26 CET
This scheduled maintenance affected: Elements - Products (Load Balancer).