On February 18th and 19th (between 8 AM and 5 PM UTC), we are going to perform on pl-waw a required operation to prepare the new v1 API arrival (available soon).
During this operation, changes will be performed to all Serverless Containers namespaces on pl-waw region.
While this operation is seamless most of the time, users may observe the following behaviors:
- Namespaces will pass temporarily in "upgrading" status. This may take up to 15 minutes, depending on the number of resources inside the namespace. During this time, all write operations on the namespace (update namespace, create container, update container, delete container, etc.) will be impossible. Read operations will work as usual. - Container instances will be created. This is mandatory to ensure the containers are working properly. If a container fails to start, the "status" field will change to "error", and the "error_message" field will show the error, so users can fix it. During that process, users could see multiple instances of their container running, even if it's configured with max_scale = 1, and even if there is no incoming traffic. The Container will downscale as soon as the operation is over. - Long running requests made during this operation may fail, as we roll out Container instances.
Please note that during this process, unless the containers cannot start because of an applicative error, the containers will always be reachable.
This process is mandatory to prepare a seamless upgrade to the new v1 API (coming soon, with new features!).
Thanks for your understanding and sorry about the inconvenience it may cause.
Posted Feb 11, 2026 - 17:48 CET
This scheduled maintenance affects: Elements - Products (Serverless Functions and Containers).